Oriana Crescent Yeronga

Oriana Crescent Yeronga

The Challenge This waterfront property was built in the 50’s and renovated in the 60’s, 80’s and then flooded in the 2011 Brisbane floods and repaired after that. The entire side of the house had sunk causing undulations in the floors and ceilings and maintenance was...
Pring Street, Hendra (Stage Three)

Pring Street, Hendra (Stage Three)

INFO Project Details Stage 3 involved building an external staircase so that you could access the pool from the main upper-level living area. We installed a landing with shower to wash off after having a swim. We replaced all the existing decking using spotted gum...
Risdon Street Carindale

Risdon Street Carindale

The Challenge The objective was to create an open space entertaining area and upgrade the pool and tiled surround. The challenge was due to fire restrictions we were unable to build any closer to the boundary. We needed to keep the roof 450mm and the beam and columns...
Shore Crescent Bulimba

Shore Crescent Bulimba

The Challenge Vue Bathrooms full renovation service to two bathrooms and a kitchen install, Reusing some of the existing fixtures in the bathrooms. The Solution Dark tiles create a bold, moody & palette whilst the textured feature tiles add interest and...
Pring Street Hendra (Stage Two)

Pring Street Hendra (Stage Two)

The Challenge The objective was to utilise unused space to create a quality entertainment bar area. The Solution The challenge we faced was to install a massive recessed shelf into a load bearing external wall. With some major engineering upgrades we were able to...